Armstrong HC-6700 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Déshumidificateurs Armstrong HC-6700. Armstrong HC-6700 Product data [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 131
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Paulson-Cheek Mechanical
6145 Northbelt Parkway
Suite F
Norcross, GA 30071
Ga. Reg. 000386
770. 729. 0076
770. 729. 1076 Fax
Northside Facial Cosmetic Surgery
Alpharetta, GA
HVAC Submittal
April 15, 2015
General Contractor
: D. C. Ecker Construction, Inc.
Mechanical Engineer
: AHA Consulting Engineers
Mechanical Contractor
: Paulson-Cheek Mechanical, Inc.
Section 1 Trane Split Systems
Section 2 Aaon Split Systems
Section 3 Humidifiers
Section 4 Grilles, Registers, & Diffusers
Section 5 Flexible Ductwork
Section 6 Spin-In Dampers, Saddle Fittings, & Line
Dampers
Section 7 Fire Dampers
Section 8 Motor Operated Dampers
Section 9 Wall Louvers
Section 10 Exhaust Fans
Section 11 Unit & Wall Heaters
Vue de la page 0
1 2 3 4 5 6 ... 130 131

Résumé du contenu

Page 1 - HVAC Submittal

Paulson-Cheek Mechanical 6145 Northbelt Parkway Suite F Norcross, GA 30071 Ga. Reg. 000386 770. 729. 0076 770. 729. 1076 Fax Northside Facial Cos

Page 2

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 8 of

Page 3 -

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 8

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 12 - ELECTRICAL / GENERAL DATA

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 13

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 9 of

Page 18

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 22

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 24 - TCONT200

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 10 of

Page 30

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 35

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 11 of

Page 38

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 12 of

Page 39

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 13 of

Page 40

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 14 of

Page 41

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 15 of

Page 42

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 16 of

Page 43 - Split System Rating

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 17 of

Page 44 - 12" EBM Plenum

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 45

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 18 of

Page 46 - Unit Submittal

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 19 of

Page 47 - Tag: CU-1-3, CU-1-4

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 20 of

Page 48

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 21 of

Page 49

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 22 of

Page 50

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 23 of

Page 51

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 52

BBB SUBMITTAL FOR Split Systems FCU-1-3, FCU-1-4 Project: Northside Facial Cosmetic Surgery Alpharetta, GA Mechanical Contractor Paulson-Ch

Page 53

TABLE OF CONTENTS I. Notes, Clarifications, and Deviations II. Specifications III. Performance IV. Selected Options V. Drawings VI. Fiel

Page 54 - Refrigeration Acccessories

Notes, Clarifications, and Deviations

Page 55 - Circuit #: 1

Prepared For: Paulson Cheek Mechanical Attn: Mark Walden 6145 Northbelt Parkway Norcross, GA 30071 Date: March 20, 2015 Sold To: Paulson C

Page 56

Notes, Clarifications, and Deviations to Specifications & Schedule • Contractor to verify voltage. Units are submitted with 208/1/60. • C

Page 58 - Control Terminals

Guide Specifications - Air Handling Units FCU-1-3 and FCU-1-4 Part 1 - General 1.01 General Description A. This section includes the design, controls

Page 59 - Internet and Cloud Ready

D. Unit shall be handled carefully to avoid damage to components, enclosures and finish. E. Unit shall be stored in a clean, dry place protected fro

Page 60 - Specifications

access door. B. Construction 1. All cabinet walls, access doors, and roof shall be fabricated of double wall, impact resistant, rigid polyurethane f

Page 61 - FC 20 Standalone Controller

voltage, the voltage is more than 10% under design voltage or on phase reversal. 4. Unit shall contain dual point power. One circuit will be for the

Page 62

suction and liquid line connections for ease of field connection. Connections shall be factory sealed on both the interior and exterior of the unit ca

Page 63 - FG-LCD-MMI

1. Unit shall modulate cooling with constant airflow to meet space temperature cooling loads. 2. With modulating hot gas reheat, unit shall modulate

Page 64 - Technical Specifications

Guide Specifications - Condensing Units CU-1-3 and CU-1-4 Part 1 - General General Description A. This section includes the design, controls and inst

Page 65

manufacturer’s written instructions for installation, operation and maintenance have been followed. Warranty excludes parts associated with routine ma

Page 66

Table Of Contents Product Summary ...

Page 67 - Product Data

visible corrosive effects, when tested in a salt spray and fog atmosphere in accordance with ASTM B 117-95 test procedure. 5. Unit shall include a fo

Page 68 - Dimensions

circuit. Condensers A. Air-Cooled Condenser 1. Condenser fan shall be horizontal discharge, axial flow, direct drive fans. 2. Fan motor shall be we

Page 70 - Current Monitoring

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC)1A1B1C1D2 3 4

Page 71

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC)JOB INFORMATION:

Page 73

203 Gum Springs Road - Longview, TX 75602 - Ph. (903) 236-4403 Fax (903) 236-4463AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC) 1A1B1C

Page 74

203 Gum Springs Road - Longview, TX 75602 - Ph. (903) 236-4403 Fax (903) 236-4463AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC)C C - C - 0 0 4 - 9 - D -

Page 75

Drawings

Page 76

Date Created/Modified: 3/16/2015 4:54:09 PM Using Ver 4.226 (OSN# 6354480) Date Printed: 3/17/2015 12:00:07 PM

Page 77

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 3 of

Page 78 - Over Traditional Units

Date Created/Modified: 3/16/2015 4:54:09 PM Using Ver 4.226 (OSN# 6354480) Date Printed: 3/17/2015 12:00:07 PM

Page 79

Date Created/Modified: 3/16/2015 4:54:09 PM Using Ver 4.226 (OSN# 6354480) Date Printed: 3/17/2015 12:00:07 PM

Page 80 - Drying Cycle

Date Created/Modified: 3/16/2015 4:54:09 PM Using Ver 4.226 (OSN# 6354480) Date Printed: 3/17/2015 12:00:11 PM

Page 81

Field Piping

Page 82 - Area Unit

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC)

Page 83 - Specification

Circuit #: 1Date Created/Modified: 3/16/2015 4:54:09 PM Using Ver 4.226 (OSN# 6354480) Date Printed: 3/17/2015 12:00:06 PM

Page 84

Controls

Page 85

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC)

Page 86

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.226 (SN: 6354480-C6MRRYWC)C C - C - 0 0 4 -

Page 87

The new FG series of Open Automation Controllers from EasyIO are the new range of Internet ready Field Controllers. They comprise of combined Area Con

Page 88

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 4 of

Page 89

Device InfoModel EasyIO-FG-32Description EasyIO-FG32 Sedona series: 32 I/O ControllerName FG32 DDCDevice SpecificationsMechanical Dimensions 9.2 in x 4

Page 90

The EasyIO FC series is aimed at aordable ‘canned’ solutions for standalone applications, such as Roof Top Units, Fan Coils, AHU’s, package units etc

Page 91

SpecificationsModel EasyIO-FC-20CPU ARM Cortex-M3, 24MHzName FC 20Device SpecificationsMechanical Dimensions 215 mm (L) x 125 mm (W) x 45 mm (H)Weight

Page 92

Descriptionstatus information and modify points value on building control system in additional to conventional Niagara AX Sedona Framework™ and interf

Page 93

Technical SpecificationsPower Supply 24 VAC/VDCPower Consumption 24VACurrent Rating 1A at 24VAC/VDCCommunication PortEthernet 10/100 Base-TProcessor AR

Page 96

Automation Components, Inc.ACIACIA/RH-TEMP SeriesRelative Humidity/Temperature CombinationsRH-TEMPRH-TEMPAttributes:Low driftHigh repeatabilityTemp

Page 97

Ordering InformationAccuracy Configuration [ ] -[ ] (R2) Room(D) Duct(O) Outdoor AirRH1 (+/- 1%)**Specify a 20 % RH Range when orde

Page 98

TMCurrent Monitoring Year Warranty5H300H600H800H900Current Switches: Fixed Trip Point Hx00 SeriesSplit-Core & Solid-Core On/Off Status Current Swi

Page 99

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 5 of

Page 100 - HVAC Submittal Cover Sheet

800.354.8556+1 503.598.4564www.veris.comCurrent MonitoringDIMENSIONAL DRAWINGSWIRING DIAGRAMHx00 SeriesH900POWERSOURCEPOWER SOURCE BUILDING AUTOMATION

Page 101

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 102

BBB SUBMITTAL FOR Humidifiers H-1, H-2 Project: Northside Facial Cosmetic Surgery Alpharetta, GA Mechanical Contractor Paulson-Cheek Mechani

Page 103

Armstrong Humidifier Two (2) Armstrong Humidifiers Complete with the following: • Model HC-6100 o 208/1/60 voltage o Capacity is 3 KW – 8.3 lbs/h

Page 108

118Armstrong International - NAarmstronginternational.comArmstrong International - EUarmstronginternational.euArmstrong International - Chinaarmstrong

Page 109

119Armstrong International - NAarmstronginternational.comArmstrong International - EUarmstronginternational.euArmstrong International - Chinaarmstrong

Page 110

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 6 of

Page 111

120Armstrong International - NAarmstronginternational.comArmstrong International - EUarmstronginternational.euArmstrong International - Chinaarmstrong

Page 112

121Armstrong International - NAarmstronginternational.comArmstrong International - EUarmstronginternational.euArmstrong International - Chinaarmstrong

Page 113

122Armstrong International - NAarmstronginternational.comArmstrong International - EUarmstronginternational.euArmstrong International - Chinaarmstrong

Page 114

Specification HumidiClean Series 6000 PART 1 PRODUCTS STEAM GENERATOR TYPE HUMIDIFIERS Steam humidifier for distribution of humidity (steam

Page 115

Specification P. A minimum tank temperature to be maintained during short periods of no demand through use of an aquastat to improve responsiven

Page 116

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Page 121

Northside Facial Cosmetic Surgery Alpharetta GA March 20, 2015 FLD = Furnished by Trane U.S. Inc. / Installed by Others Equipment Submittal Page 7 of

Page 128

Submittal Section Sheet 3.25.15 3/25/2015Paulson-Cheek Mechanical, Inc.6145 Norhtbelt Parkway, Suite FNorcross, GA 30071PROJECT:Northside Facial Cosme

Commentaires sur ces manuels

Pas de commentaire